Los Angeles Harbor College Solar (PV) Farm

Chevron Energy Solutions – Los Angeles Harbor College Solar (PV) Farm project consisted of:

  • In January 2009, Beezley Management provided on-site construction management services for a project on the Los Angeles Harbor College campus. The initial phase required the removal and reconstruction of three parking lots (6, 7, and 8) and providing photovoltaic panels for installation on a covered parking structure. The intent is for the campus to generate their own power and sustain campus operations to become power neutral.

Owner and Contact Information:
Tom Hall, LACCD

Executive Director Facilities

Construction Management Team:

Pinnacle One (ARCADIS)/Beezley Management

Beezley Project Representative/Role:

Mark Ratoza, Construction Manager

Architect:

Chevron Energy Solutions (design-build)

General Contractor:

Chevron Energy Solutions

Dollar Value:

$27 Million

Construction Dates:

2009